
Pre-Treated Compatible Fast-Deployment Skid-Mounted LNG Gas Liquefaction Plant. Fast Deployment: Non-welding installation allows complete skid assembly or disassembly within 20-50 days. Skid-Mounted Design: Modular structure ensures low investment, less land occupation, and easy transportation. High Automation: Full automation grade with remote monitoring capabilities for efficient operation. Flexible Operation: Operates within 50-110% capacity range, adapting to unstable gas pressure and composition. MRC Technology: Simple technical process using Mixed Refrigerant Cycle for efficient liquefaction. Long Service Life: Static and rotating equipment designed for a 20-year service life. Wide Gas Source Adaptability: Compatible with pipeline gas, flare gas, well gas, oilfield associated gas, and biogas. Remote Area Suitability: Designed for locations lacking water and stable power sources.