
Fast-Deployment High-Capacity Self-Powered Skid-Mounted LNG Gas Liquefaction Plant. Fast Deployment: Non-welding installation allows complete skid assembly or disassembly within 20-50 days. High Capacity Output: Processes 150,000 Nm3/d of feed gas to produce 90 tons of LNG per day. Flexible Operation: Operates effectively within a 50-110% capacity range for unstable gas pressures. Skid-Mounted Design: Modular structure ensures low investment, less land occupation, and easy transport. Multi-Source Compatibility: Accepts pipeline gas, flare gas, well gas, oil-associated gas, and biogas. Remote Monitoring: High automation grade with remote monitoring suitable for remote areas. Long Service Life: Static and rotating equipment designed for a 20-year service life. Energy Efficient: Low power consumption of 0.4 kWh per Nm3 of LNG produced.