
Xq89/3yc Tubing Tong / Hydraulic Power Tubing Tong Screw Drilling Operation Tool. Wide Tubing Range: Handles 2 3/8' to 3 1/2' tubing with master tong and up to 4 1/2' with backup tong. High Torque Capacity: Delivers 3.0 kN.m low gear and 1.1 kN.m high gear rated torque for efficient operations. Optional Torque Control: Torque control valve and system can be equipped as optional features for precision. Durable Construction: Made of cast steel with sand blast surface treatment for long-lasting performance. 1-Year Warranty: Includes a comprehensive 1-year warranty covering manufacturing defects. High Speed Operation: Features high gear speed of 100 r/min and low gear speed of 30 r/min. Flexible Backup Support: Backup tong can clamp tubing body with lengthening guide pole assembly. Global Shipping Terms: Available for FOB and CIF shipping to North America, South America, and other regions.