
8650m³ Hybrid-Electric Trailing Suction Hopper Dredger Vessel Engine Pump Stable Power Output Smooth Operation 3km Blowing. Hybrid Electric Power: Two 4500KW MAN engines and 600KW auxiliary engines for stable, energy-efficient operation. Long Blowing Distance: Capable of blowing mud up to 3km with 95 minutes per ship cycle. Advanced Control System: Equipped with satellite positioning, wave compensators, and monitoring software for high precision. CCS Certified Safety: Built to latest CCS international specs with rigorous video inspection and machinery testing. Customizable Options: Customized auxiliary engine power, mud hopper volume, and blowing distance available. Fast Unloading Speed: Mud unloading takes about 10 minutes per boat, loading takes about 30 minutes. Robust Winch System: Multiple winches (550KN to 300KN) ensure stable operation under complex working conditions.