
Cleanroom Engineering for Biopharma Production Zones. Modular Cleanroom System: Pioneered modular design in 2014 combining structural modularity with smart control and energy-saving features. Fast Installation Time: Typical installation takes 2-6 weeks due to modular system, significantly shorter than traditional construction. Comprehensive Warranty: Provides 3-year warranty coverage for all cleanroom systems. Global Compliance Standards: Fully compliant with ISO 14644, GMP, FDA, and EU GMP requirements. Customizable Design: In-house engineering team provides customized layout and HVAC design based on specific process needs. Flexible Expansion: Modular structure allows for easy expansion, relocation, or upgrading to reduce future investment risks. Advanced Control System: Features PLC control with remote support via central control system and network. Proven Track Record: Successfully implemented in over 300 enterprises and exported to 30+ countries including US, Europe, and Japan.